We provided technical consulting services in the fields of structural and construction engineering, as well as electrical installations, along with health and safety supervision during the construction of the Żary Wind Farm, with a total capacity of 21 MW (7 turbines).
Our role included technical support for the investor at every stage of construction, verification of structural and electrical solutions, and ongoing supervision of workplace safety on the construction site. Through continuous monitoring of construction and installation processes, we ensured compliance with regulations and maintained safe working conditions, enabling the efficient execution of the project.
Project details
MEAG
April 2020 – October 2022
Żary